Case Studies

Case Studies

7UP/RC Bottling Company

7UP/RC Bottling Company

A 40,000 square foot project including look prevention, rust removal, and a cool roof coating application.

Read More
Cintas Headquarters

Cintas Headquarters

A perfect example of proper preventative maintenance for the 18,000 square foot roof of Cintas Headquarters

Read More
Kubota Manufacturing of America

Kubota Manufacturing of America

ToppsĀ® stopped leaks and restored the facility's 616,000 square foot metal roof.

Read More
Sterile Fly Production Facility

Sterile Fly Production Facility

In a joint venture with the Mexican and U.S. Department of Agriculture, Topps Products succeeded in waterproofing a 250,000 square foot facility.

Read More
Xcel Energy

Xcel Energy

An example of a preventative investment from Xcel Energy due to localized leaks.

Read More