1. Prep work to
watertight. Roof is cleaned, seamed with two layers of
SeamGuard™, fasteners tightened and/or replaced and sealed with
RivetGuard™, all flashings addressed including Polyprene™
flashing cement as needed, any replacement metal done (45%).
2. First layer of
TOPPS® roofing installed. RustArrestor™ is
applied if needed (recleaned if done as separate trip) and
either Topps Seal™ or Base Coat™ is applied. Leaves an
attractive, uniform look and reduces cleaning work required for
final layer. If done as separate trip (35%). Reduce to (20%) if
done during same time as #1 above.
3. Final layer of
TOPPS®. Roof is rinsed using low pressure and
final layer of Topps Seal™ applied (35%). This becomes (30%) if
#1 & 2 above are not done together.
NOTE: Adding
1, 2, & 3 comes up to 110% of your original bid if 1 & 2 are not
done together. This adjusts for extra cleaning work that occurs
if you cannot put your Base Coat (stage 2) down initially when
doing stage 1. |